700 Series Integrated · Note 05
Moving a 700 Series Into New Cabinetry
A 700 can go into new cabinetry when the opening follows Sub-Zero's guide: 80 inches high, 27 or 36 inches wide, and deep enough for a 24-inch cabinet plus its panel. Sub-Zero Appliance Repair Bellevue checks the seals and temperatures before the move and the level, reveals and cooling after it. Call (425) 696-2636.
SignedBjorn Aaltonen
- In the trade
- 15 years
- Holds
- EPA 608 certified
- Written
Before it leaves the old opening
We test the seals, read the temperatures and note the model and serial from the plate left of the upper drawer while the old kitchen still stands. A worn gasket or a weak compartment found after the move looks like damage from the move, and nobody can then say which it was. Parts the unit already needs are ordered against the tag ahead of the move.
What the new opening has to give it
- Air to the condenser. The condenser sits behind the kickplate, and the kickplate must stay removable for service, with no floor or trim blocking it. A decorative front may not cover its louvres.
- Power and water. A separate circuit that serves only this unit, and for ice-maker models a supply line with an easy-to-reach shut-off. Those belong to the electrician and the plumber.
- Anti-tip bracket. The new opening needs its own, fixed before the unit rolls in.
- Neighbours. Two units side by side need Sub-Zero’s dual installation kit, or at least a 2-inch filler strip between them.
- Swing. The door opens to 105 degrees. A door that would strike a wall, or a panel thicker than 3/4 inch with a reveal under 1/4 inch, calls for the 90-degree stop built into the hinges.
After it goes in
We read the level first, because the guide ties a cabinet set off level to doors that do not close properly. Then the reveals, which the guide shows at 1/8 inch as typical, then the paper test round every seal, then the temperatures against the readings taken before the move.
Who does what
Moving and setting the cabinet, the bracket, the wiring and the water line belong to the installer and the trades. New panels belong to the cabinetmaker. Our part is the unit itself: how it stood before the remodel, and whether its seals and cooling came through it.
Asked about this
Can a 700 be laid down to get it through a doorway?
Sub-Zero's installation guide says a unit that has been on its back or side must stand upright for at least 24 hours before its power is connected. A move that lays it down has to allow for that wait. Sub-Zero Appliance Repair Bellevue checks the cooling after it has run in place; (425) 696-2636.
Where this sits
Back to 700 Series Integrated700TR, 700TCI, 736TR, 736TCI: the series this note belongs to.